April 13, 2026

SL800 Production Line Installed in Central Asia — Water Supply Network Expansion

Suba Machinery
SL800 Production Line Installed in Central Asia — Water Supply Network Expansion

Project Context

A regional Ministry of Water Resources undertook an ambitious urban water supply modernization program. The initiative required producing large-diameter corrugated HDPE drainage and supply pipe on a national scale.

A local contractor was awarded a major supply contract to furnish 50,000+ linear meters of 600–800mm corrugated pipe annually, replacing aging asbestos infrastructure.

Why the SL800

The contractor's engineers specified an SL800 after evaluating equipment from five manufacturers. Key requirements:

  • Capacity for 800mm outer diameter pipe
  • Output of 600+ m/shift
  • Ability to work with reinforced HDPE formulations
  • Post-production coil-winding capability
  • 24-month lead time acceptable

The SL800's proven track record in the Middle East and its integrated unwinding system made it the clear choice.

The Order

Contract awarded October 2023. Total project cost: €280,000 including installation, training, and one year of on-site technical support. Delivery scheduled for Q2 2024.

Delivery & Installation

Suba shipped the SL800 in two containers, arriving on-site in May 2024. Assembly took 4 weeks, with Suba's senior technicians on-site throughout. The contractor's team completed a 3-week operator certification program in April 2024.

Results

The machine went into production in June 2024 and achieved full capacity by August. Current performance:

SpecificationTargetActual
Outer Diameter600–800mm600–800mm ±2mm
Wall Thickness3–4mm3.8mm ±0.1mm
Daily Output600 m625 m
Corrugation QualityStandardPremium
Uptime (trailing 3 months)85%92%

The contractor has already received orders for 150,000+ linear meters in year one, and has begun discussions with Suba about a second line for Q2 2025.

"The SL800 exceeds every expectation. Our clients are receiving water infrastructure that will serve for 50+ years. The quality, speed, and reliability of the Suba machine is why we won this contract." — Chief Operations Officer
Suba Machinery
Suba SL800 installation and operation - Photo 1
Suba SL800 installation and operation - Photo 1
Suba Machinery
Suba SL800 installation and operation - Photo 2
Suba SL800 installation and operation - Photo 2
Suba Machinery
Suba SL800 installation and operation - Photo 3
Suba SL800 installation and operation - Photo 3
Suba Machinery
Suba SL800 installation and operation - Photo 4
Suba SL800 installation and operation - Photo 4

Интересует эта машина?

Interested in the SL800? Contact us for specifications and pricing.

Request SL800 Specs

Share this article

Interested in our products?

Contact us for detailed specifications and pricing

Get Quote

Готовы начать производство?

Свяжитесь с нами для бесплатной консультации и报价

Бесплатная техническая консультация
Инженеры доступны 24/7
Ответ в течение 24 часов