April 13, 2026

SL180 Line Commissioned in South Asia — High-Speed Corrugated Conduit for Telecom Infrastructure

Suba Machinery
SL180 Line Commissioned in South Asia — High-Speed Corrugated Conduit for Telecom Infrastructure

Project Context

A national broadband mission aims to deliver high-speed fiber-optic internet to the country's population. A critical bottleneck emerged: demand for underground cable protection conduit far exceeded local production capacity.

A local manufacturer identified an opportunity to supply corrugated HDPE conduit to telecom infrastructure contractors and electrical utilities across the country. They commissioned the Suba SL180 — a high-speed, small-diameter line — to meet the explosive growth in demand.

Why the SL180

The SL180 was selected for:

  • High output: 1,500–2,000 m/shift of 110–180mm diameter conduit
  • Compact design: Suitable for shared manufacturing facilities
  • Cost-effective: Capital investment under €85,000
  • Quality: Meets local bureau of standards requirements for telecom conduit
  • Scalability: Proven path to a second unit if demand justifies

The Order

Contract finalized in Q1 2024. Delivery in Q3 2024. Installation and training completed in October 2024.

Delivery & Installation

Suba shipped the SL180 via ocean freight and road transport to the manufacturing facility. Installation took 2 weeks, with one Suba technician and the contractor's team. The operator certification program took 1 week.

Results

The machine achieved full capacity by Q4 2024. Current production metrics:

SpecificationTargetActual
Outer Diameter110–180mm110–180mm ±1mm
Wall Thickness2.5–3mm2.8mm ±0.1mm
Output1,500–1,800 m/shift1,850 m/shift
Defect Rate<0.5%0.15%
Uptime88%92%

The manufacturer has already received orders for 500,000+ linear meters in year one, with strong demand from major telecom operators and state utility companies.

Market Impact

This represents a critical moment in the national fiber rollout: by producing locally, the manufacturer can reduce cost by 25% compared to imports, accelerating deployment timelines for telecom infrastructure nationwide.

"The Suba SL180 arrived at exactly the right moment. The market needs conduit — lots of it. We're now producing at full capacity and still can't keep up with demand. This machine is our ticket to becoming a leading supplier of telecom infrastructure." — Operations Director
Suba Machinery
Suba SL180 installation and operation - Photo 1
Suba SL180 installation and operation - Photo 1
Suba Machinery
Suba SL180 installation and operation - Photo 2
Suba SL180 installation and operation - Photo 2

Интересует эта машина?

Interested in the SL180? Contact us for specifications and pricing.

Request SL180 Specs

Share this article

Interested in our products?

Contact us for detailed specifications and pricing

Get Quote

Готовы начать производство?

Свяжитесь с нами для бесплатной консультации и报价

Бесплатная техническая консультация
Инженеры доступны 24/7
Ответ в течение 24 часов